|
About:
|
When a pile is burnt out and we pour the concrete before the augers are removed it is described as a CFA pile or SFA pile. Screw stacks come in areas, the initial section which is set up has the cutting blade. If the wanted depth as well as as a result lots bearing capacity has not been reached, subsequent lengths are then used.
|